WDCS/ERP Link Settings
Server Configuration
Before initializing the WDCS/ERP Link Interface, please setup the server configuration settings. This is needed to be able to transfer data between WDCS and the ERP. The information required includes:
- Server Id (Database Server Name)
- Company Name
- Warehouse ID (Warehouse to Sync)
- Server Url (Warehouse Integrator Portal (Wip))
- Server username (Wip)
- Server password (Wip)
Job Schedule
One of the most essential tools found in the WDCS/ERP Link Interface is the ability to automate all WDCS Transactions.
As shown above, every scheduled task will appear under the Job Schedule section. Each task must include the description and schedule time of the task. It is possible to add multiple tasks under the same schedule group.
ERP Configuration
After setting up the database server configuration, the next step is to configure the ERP settings. Depending on the ERP, the required fields may vary from one system to the other.
SAP Business One ERP Configuration
The required fields for the SAP Business One ERP include:
- ERP Connection String
- Username
- Password
- Host Server
- Host License Server
- DB Server Username
- DB Server Password
- Host Company
Name | Version |
---|---|
SAP Business One Release | 9.2 or higher |
DI-API /DI Server | DI API 90 |
Database Systems | MS SQL Server 2008 or higher |
SQL Server Offline Configuration
The only required field is the connection string to access the SQL Database where data will be transfer to/from WDCS.